To improve the accessibility to and
within Sengkang New Town, LTA embarked on the construction of a pair of
flyovers at the Tampines Expressway (TPE)/ Sengkang East Road Interchange
and TPE/ Sengkang East Drive.
Construction for the S$23.52 million project
commenced in March 2001. The flyovers and various slip roads were progressively
opened as soon as they were ready for use. On 14 April 2004, the final
slip road from TPE to Sengkang East Road and Punggol Way was opened to
traffic. This marked the completion of the project.

Motorists travelling between Sengkang East
Drive to Punggol East have been able to enjoy faster journeys when the
flyover was opened on 23 November 2003. Travelling via this flyover will
shave 2.3 kilometres off the usual travel route. Travelling time is also
shortened by more than five minutes.
The completion of the flyover has also given
residents of Punggol New Town an alternate route to the city besides the
existing Punggol Road.
The flyover at Sengkang East Road provides
motorists travelling along TPE access to both Sengkang and Punggol estates.
It also links the two towns to bring about more convenience for residents.
With the road interchange, travelling time
to the city and Changi Airport have been shortened. It also relieves the
traffic conditions at the existing Punggol Road Interchange.
The completion of the flyover at Sengkang
East Drive has also given residents of Punggol New Town an alternative
route to the city, besides the existing Punggol Road.

|
Contract No.
|
Description
|
Name of Contractor
|
C3230
|
TPE
/ Sengkang East Road Interchange and TPE / Sengkang East Drive Flyover
|
Wee Poh Construction Co (Pte) Ltd.
|

Last Updated on 26/04/2004
|