LTA and PUB work closely to ensure adequate drainage system for new stations

Media Replies 17 Sep 2012 road infrastructure flood measures

We refer to Mr Chew Mun Kit’s letter "Flood worry with more MRT lines" (The Straits Times, 11 September 2012).

When planning for new MRT stations, PUB and LTA work closely to ensure that adequate drainage infrastructure are put in place at the stations. This is done throughout the entire project from the planning and design of the stations to the subsequent construction phase.

Prior to project implementation, LTA carries out an engineering assessment on the drainage in the vicinity of new stations to ensure that new and existing drainage facilities can cater to the anticipated surface water runoff. These assessments are carried out in consultation with PUB and are in accordance with the Code of Practice on Surface Water Drainage. During the construction period, PUB and LTA will conduct regular checks to ensure that drains in the vicinity continue to be free-flowing.

We thank Mr Chew for the opportunity to explain.
 
Helen Lim
Director, Media Relations & Public Education
Land Transport Authority

Scroll To Top

Welcome to the

new LTA.GOV.SG


This quick tour will bring you through the key enhancements.

Use the links at the top navigation bar to help you find what you are looking for


Tutorial Menu Tutorial Menu Tutorial Menu

Jump straight into the popular pages that

are most relevant to you


Tutorial Popular Resources Tutorial Popular Resources Tutorial Popular Resources

Taking a bus, train, or cycling to your

destination? Plan your routes and check

the fares using these tools!


Tutorial Transport Tools Tutorial Transport Tools Tutorial Transport Tools

Our latest featured projects are just a click away!


Tutorial Featured Projects Tutorial Featured Projects Tutorial Featured Projects

Start exploring the new

LTA.GOV.SG now!



Explore Now!