Opening of New Road Extension from Flora Drive to Upper Changi Road North

Road Announcements 09 Mar 2013

 

The Land Transport Authority (LTA) has completed the extension of Flora Drive to Upper Changi Road North.

The new extended road will be opened from 4pm, Saturday, 9 March 2013. This new road extension will provide a new link between Flora Drive and Upper Changi Road North and improve the overall traffic circulation for the road network serving the residential estates along Flora Road, Flora Drive and Mariam Way.

As part of the road improvements in the area, LTA has also opened a new entry slip road from TPE (PIE) to Changi North Crescent in October 2012 and an exit slip road from Changi North Crescent onto the PIE (Changi), in May 2011. Besides using the existing Upper Changi Road North/ Upper Changi Road East/ TPE junction, motorists can also make use of these 2 slip roads to access and exit Changi North, hence improving the capacity and traffic circulation of the road network serving the industrial developments in the Changi North area.

Please refer to the attached map for more details.

Motorists are advised to drive carefully and follow the directional signs on display.

Scroll To Top

Welcome to the

new LTA.GOV.SG


This quick tour will bring you through the key enhancements.

Use the links at the top navigation bar to help you find what you are looking for


Jump straight into the popular pages that

are most relevant to you


Taking a bus, train, or cycling to your

destination? Plan your routes and check

the fares using these tools!


Our latest featured projects are just a click away!


Start exploring the new

LTA.GOV.SG now!



Explore Now!