Temporary Closure of Tunnel and Slip Roads at KPE

Road Announcements 21 Feb 2014

To facilitate maintenance works at the Kallang-Paya Lebar Expressway (KPE) tunnel, the following sections of the expressways or slip roads will be temporarily closed to traffic from 12am to 5am:

Location

Closure Date

Alternative Route

PIE (Changi) to KPE (TPE)

24 February 2014

Exit to PIE (Tuas) or PIE (Changi) at Exit 2B

Sims Ave to KPE (TPE)

Airport Road to KPE (TPE)

Airport Road to KPE (ECP)

24 February 2014

 

Exit to Tampines Rd at Exit 9A

 

Tampines Rd to KPE (ECP)

Motorists are advised to drive carefully and follow the directional signs on display.

Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA.

Scroll To Top

Welcome to the

new LTA.GOV.SG


This quick tour will bring you through the key enhancements.

Use the links at the top navigation bar to help you find what you are looking for


Tutorial Menu Tutorial Menu Tutorial Menu

Jump straight into the popular pages that

are most relevant to you


Tutorial Popular Resources Tutorial Popular Resources Tutorial Popular Resources

Taking a bus, train, or cycling to your

destination? Plan your routes and check

the fares using these tools!


Tutorial Transport Tools Tutorial Transport Tools Tutorial Transport Tools

Our latest featured projects are just a click away!


Tutorial Featured Projects Tutorial Featured Projects Tutorial Featured Projects

Start exploring the new

LTA.GOV.SG now!



Explore Now!