Temporary Road Closure at Keppel Viaduct

Road Announcements 10 Mar 2014

As part of the widening works for Keppel Viaduct, the following roads will be temporarily closed to traffic from 1am to 5am on the following dates:

Location

Closure Date

Alternative Route

Keppel Viaduct (towards Tuas) from (MCE Exit 1A)

12, 13, 20 and 21 March 2014

Route 1- Use Exit 1A for Keppel Road and use Keppel Flyover to AYE (Tuas)

Route 2 – Use Exit 1A for Keppel Road to Telok Blangah Road

Refer Map A

  a) Keppel Viaduct (towards MCE) from (AYE Exit 2B)

 

   b) Up ramp from Keppel Road to Keppel Viaduct (MCE) near Keppel Distripark

Use Exit 2B for Keppel Road to MCE

 

 

Use Keppel Road to MCE

Refer Map B

Motorists are advised to drive carefully and follow the directional signs on display.

Scroll To Top

Welcome to the

new LTA.GOV.SG


This quick tour will bring you through the key enhancements.

Use the links at the top navigation bar to help you find what you are looking for


Jump straight into the popular pages that

are most relevant to you


Taking a bus, train, or cycling to your

destination? Plan your routes and check

the fares using these tools!


Our latest featured projects are just a click away!


Start exploring the new

LTA.GOV.SG now!



Explore Now!