Temporary closure of slip road from Yio Chu Kang Road towards SLE (BKE)

Road Announcements 02 Jan 2015

To facilitate flyover works, the Land Transport Authority (LTA) will temporarily close the slip road from Yio Chu Kang Road towards SLE(BKE) from 12.00am to 05.00am.

From

Closure Date

Alternative Route

Yio Chu Kang Road (Westbound)

 

 

06 – 07 January 2015

Motorists are advised to travel along Yio Chu Kang Road, turn right into Lentor Ave and turn left to SLE(BKE).

Refer to Annex 1

Yio Chu Kang Road (Eastbound)

06 – 07 January 2015

Motorists are advised to make a U-turn below Yio Chu Kang Flyover, turn right into Lentor Ave and turn left to SLE(BKE).

Refer to Annex 2

Directional and information signage will be placed well in advance of the road closure to inform and guide the motorists.

Scroll To Top

Welcome to the

new LTA.GOV.SG


This quick tour will bring you through the key enhancements.

Use the links at the top navigation bar to help you find what you are looking for


Jump straight into the popular pages that

are most relevant to you


Taking a bus, train, or cycling to your

destination? Plan your routes and check

the fares using these tools!


Our latest featured projects are just a click away!


Start exploring the new

LTA.GOV.SG now!



Explore Now!