Temporary road closure of Yio Chu Kang Road (Westbound) towards TPE(Changi)/SLE(BKE)/Ang Mo Kio Ave 6/Lentor Ave

Road Announcements 30 Apr 2015

To facilitate flyover construction works, the Land Transport Authority (LTA) will temporarily close a stretch of Yio Chu Kang Road (Westbound) towards TPE(Changi)/ SLE(BKE)/ Ang Mo Kio Ave 6/ Lentor Ave at the junction with CTE from 01.00am to 05.00am daily on the following dates:

Affected Road

Closure Dates

Alternative Route

Yio Chu Kang Road(Westbound) to TPE(Changi)

05, 06, 08 and 12 May 2015

Motorists are advised to turn right to Sengkang West Road, turn right to Sengkang West Ave, turn left to Jalan Kayu and turn right to TPE(Changi).

Refer to Annex 1

Yio Chu Kang(Westbound) to SLE(BKE)

05, 06, 08 and 12 May 2015

Motorists are advised to turn left to CTE(City), turn left to Exit 14, and u-turn at Ang Mo Kio North Flyover.

Refer to Annex 2

Yio Chu Kang(Westbound) to Ang Mo Kio Ave 6/Lentor Ave

05, 06, 08 and 12 May 2015

Motorists are advised to turn left to CTE(City), turn left to Exit 14, U-turn at Ang Mo Kio North Flyover, turn left to Exit 15, and turn left to Ang Mo Kio Ave 6 or turn right to Lentor Ave.

Refer to Annex 3

Directional and information signs will be displayed in advance to inform motorists of the realignment. Motorists are advised to drive carefully and to follow the directional signs displayed.

Scroll To Top

Welcome to the

new LTA.GOV.SG


This quick tour will bring you through the key enhancements.

Use the links at the top navigation bar to help you find what you are looking for


Jump straight into the popular pages that

are most relevant to you


Taking a bus, train, or cycling to your

destination? Plan your routes and check

the fares using these tools!


Our latest featured projects are just a click away!


Start exploring the new

LTA.GOV.SG now!



Explore Now!