Temporary road closure of slip road from SLE/TPE towards Yio Chu Kang Road (Westbound), slip road from Yio Chu Kang Road (Eastbound) to CTE(City), CTE to SLE(BKE), slip road from TPE to CTE (City), SLE to TPE(Changi)/Jalan Kayu and TPE/Jalan Kayu to SLE(BKE)

Road Announcements 15 May 2015

To facilitate expansion works for the CTE/TPE/SLE interchange, the following roads will be temporarily closed to traffic on the following dates and timings:

Location

Closure Date/ Timing

Alternative Route

Slip road from SLE/TPE to Yio Chu Kang Road (Westbound)

19 – 21 May 2015/ 12.00am to 05.00am

Motorists travelling from SLE/TPE to Yio Chu Kang Road (Westbound) are advised to turn left to Yio Chu Kang Road and U-turn at Yio Chu Kang Road/Begonia Road junction.

Refer to Annex 1

Slip road from Yio Chu Kang Road (Eastbound) to CTE(City)

21, 22, 26 and 27 May 2015/
12.00am to 05.00am

Motorists are advised to travel along Yio Chu Kang Road, U-turn at Yio Chu Kang Road/Begonia Road junction and turn left to CTE(City).

Refer to Annex 2

CTE to SLE(BKE)

19 – 20 May 2015/
01.00am to 05.00am

Motorists are advised to keep left to Exit 1 and keep left to SLE(BKE).

Refer to Annex 3

Slip road from TPE to CTE(City)

20 – 21 May 2015/
12.00am to 05.00am

Motorists are advised to keep left to Yio Chu Kang Road, turn left to Yio Chu Kang Road, make a u-turn at Yio Chu Kang Road/Begonia Road junction and turn left to CTE(City).

Refer to Annex 4

a)     SLE to TPE(Changi)/Jalan Kayu

 

b)     TPE to SLE(BKE)

 

c)     Jalan Kayu to SLE(BKE)

 

21 – 22 May 2015/
01.00am to 05.00am

a)     Motorists are advised to keep left to Exit 1B, make a u-turn at Seletar West Link/Seletar Aerospace Road junction, turn left and keep right to TPE or turn left and keep left to Jalan Kayu.

 

b)     Motorists are advised to keep left to Exit 13, keep left to Yio Chu Kang Road, make a u-turn under Yio Chu Kang Flyover and keep left to SLE(BKE).

 

c)     Motorists are advised to keep left to Yio Chu Kang Road, make a U-turn under Yio Chu Kang Flyover and keep left to SLE(BKE).

Refer to Annex 5 to 7

Directional and information signages will be placed well in advance of the road closure to inform and guide motorists. Motorists are advised to drive carefully and follow the directional signs on display.

Scroll To Top

Welcome to the

new LTA.GOV.SG


This quick tour will bring you through the key enhancements.

Use the links at the top navigation bar to help you find what you are looking for


Jump straight into the popular pages that

are most relevant to you


Taking a bus, train, or cycling to your

destination? Plan your routes and check

the fares using these tools!


Our latest featured projects are just a click away!


Start exploring the new

LTA.GOV.SG now!



Explore Now!