Temporary road closure along Keppel Viaduct, Keppel Road, Keppel Flyover and Up Ramp to Keppel Viaduct (MCE)

Road Announcements 25 Sep 2015

As part of the widening works for Keppel Viaduct, the following roads will be temporarily closed to traffic from 01:00 a.m. to 05:00 a.m. on the following dates:

Location

Date

Alternative Route

Keppel Road (towards MCE) between Anson Road and Shenton Way

29 September

to

5 October 2015

Use Anson Road and turn right to Parsi Road for Shenton Way. Turn left at Shenton Way/Keppel Road Junction for MCE.

Refer to Map A

Slip road from Keppel Road to Keppel Flyover [AYE(Tuas)].

29 September

to

5 October 2015

Use Keppel Road (Towards Telok Blangah Road) and make a U-turn at Telok Blangah Road/Kampong Bahru Road junction to Keppel Road. Turf Left to AYE(Tuas)

Refer to Map B

Up ramp from Keppel Road to Keppel Viaduct (MCE) near Keppel Distripark

29 September

to

5 October 2015

Use Keppel Road to MCE

Refer to Map C

Keppel Viaduct (towards Tuas) from (MCE Exit 1)

4 & 5

October 2015

Route 1 – Use Maxwell Road (MCE Exit 1) to Shenton Way. Turn right to Keppel Road and use Keppel Flyover to AYE (Tuas).
 

Route 2 – Use Maxwell Road (MCE Exit 1) to Shenton Way. Turn right to Keppel Road for Telok Blangah Road.

Refer to Map D

Motorists are advised to drive carefully and follow the directional signs on display.

Scroll To Top

Welcome to the

new LTA.GOV.SG


This quick tour will bring you through the key enhancements.

Use the links at the top navigation bar to help you find what you are looking for


Jump straight into the popular pages that

are most relevant to you


Taking a bus, train, or cycling to your

destination? Plan your routes and check

the fares using these tools!


Our latest featured projects are just a click away!


Start exploring the new

LTA.GOV.SG now!



Explore Now!