LTA Media Statement: Advance Engineering Study (AES) for the Singapore stretch of the Kuala Lumpur-Singapore High Speed Rail (HSR)

News Releases 19 Jul 2016 high speed rail (HSR)

The Land Transport Authority will be calling an Advance Engineering Study (AES) tender to invite bids from consultants to carry out engineering studies for the Singapore stretch of the Kuala Lumpur-Singapore High Speed Rail (HSR). The AES will include looking into the HSR alignment within Singapore, the architectural and engineering design of the terminus in Singapore, noise and vibration issues, as well as the preparation of tender documents for the construction phase of the project. The tender will be called within the next month. The AES is expected to commence by the first quarter of 2017 and will take about 18 - 24 months to complete. 

Scroll To Top

Welcome to

LTA.GOV.SG


This quick tour will bring you through the key enhancements.

Use the links at the top navigation bar to help you find what you are looking for


Tutorial Menu Tutorial Menu Tutorial Menu

Jump straight into the popular pages that

are most relevant to you


Tutorial Popular Resources Tutorial Popular Resources Tutorial Popular Resources

Taking a bus, train, or cycling to your

destination? Plan your routes and check

the fares using these tools!


Tutorial Transport Tools Tutorial Transport Tools Tutorial Transport Tools

Our latest featured projects are just a click away!


Tutorial Featured Projects Tutorial Featured Projects Tutorial Featured Projects

Start exploring

LTA.GOV.SG now!



Explore Now!