Expansion of KPE/TPE Interchange and New Link Roads to Punggol Central and Pasir Ris

This project involves the expansion of KPE/TPE Interchange and construction of new link roads to Punggol Central and Pasir Ris. The works include construction of vehicular bridges, flyovers, slip roads, piled roadway and drainage works.

This project when completed by 2Q 2021, will provide residents living in Punggol and Pasir Ris with another direct route to/from KPE and TPE. It will alleviate the traffic congestion at TPE between Punggol Way and KPE as well as the existing access points of Punggol town. It will also meet future traffic demands from developments in the area.

On 25 November 2018 , the new link roads connecting Punggol Central to KPE and TPE(PIE) were opened to traffic. 

On 30 March 2019, a new slip road from TPE(SLE) Exit 6 to Halus Link towards Lorong Halus and Punggol Central was opened to traffic.

Subsequently, on 18 May 2019, another new slip road from TPE(PIE) Exit 7 to Halus Link towards Lorong Halus and Punggol Central was also opened to traffic.

The construction works in progress include:

a)      a new slip road from KPE(TPE) to TPE(SLE);

b)      a new slip road from Halus Link to TPE(SLE);

c)      extension of the link road from Lorong Halus to Pasir Ris Industrial Drive 1, which completes the link between Punggol Central and Pasir Ris Town.

Contractor: Hwa Seng Builder Pte Ltd

Scroll To Top

Welcome to the

new LTA.GOV.SG


This quick tour will bring you through the key enhancements.

Use the links at the top navigation bar to help you find what you are looking for


Jump straight into the popular pages that

are most relevant to you


Taking a bus, train, or cycling to your

destination? Plan your routes and check

the fares using these tools!


Our latest featured projects are just a click away!


Start exploring the new

LTA.GOV.SG now!



Explore Now!