Joint Statement by the Land Transport Authority (LTA) & SBS Transit - Signalling System Fault Causing Delays on the Downtown Line on 1 March 2018

News Releases 01 Mar 2018 Media Statement

Train services on the Downtown Line (DTL) were affected by a signalling system fault at Bayfront station at 6.01am this morning (1 Mar 2018). As a result, trains approaching Bayfront station in both directions had to be driven manually and at a lower speed.

By 7.30am, the signalling fault was isolated to the stretch from Promenade to Bayfront stations in the direction of Expo. However, due to train bunching, there were additional journey times of 15 minutes to half an hour from Bukit Panjang station.

Currently, trains are still travelling at lower speeds from Promenade to Bayfront stations, with additional travel times of up to 15 minutes over that stretch. Free boarding of regular bus services is available at designated bus stops between Bugis and Chinatown stations.

The signalling system supplier Siemens is working closely with our engineering teams to restore normalcy at the affected stretch as soon as possible.

We are sorry for the inconvenience caused to commuters.

Scroll To Top

Welcome to

LTA.GOV.SG


This quick tour will bring you through the key enhancements.

Use the links at the top navigation bar to help you find what you are looking for


Tutorial Menu Tutorial Menu Tutorial Menu

Jump straight into the popular pages that

are most relevant to you


Tutorial Popular Resources Tutorial Popular Resources Tutorial Popular Resources

Taking a bus, train, or cycling to your

destination? Plan your routes and check

the fares using these tools!


Tutorial Transport Tools Tutorial Transport Tools Tutorial Transport Tools

Our latest featured projects are just a click away!


Tutorial Featured Projects Tutorial Featured Projects Tutorial Featured Projects

Start exploring

LTA.GOV.SG now!



Explore Now!