The Seletar Link Flyover will open on 22 January 2024 at 2.00pm. This new flyover will provide a new connection from Seletar Link to the Tampines Expressway (Central Expressway/Seletar Expressway) (TPE (CTE/SLE)), as well as between Tampines Expressway (Kallang-Paya Lebar Expressway/Pan Island Expressway) (TPE (KPE/PIE)) and Seletar Link. The new flyover will support the expected increase in traffic due to new developments in Punggol Town and Pulau Punggol Timor.
2. Spanning an approximate road length of 1.05km, the new flyover will provide an alternate route for motorists travelling from Punggol Town to SLE or CTE. It will also enhance connectivity for industrial developments on Pulau Punggol Timor, serving as a more direct route for vehicles heading to SLE or CTE. In addition, the flyover will provide a connection to developments in Sengkang Town when the new Sengkang West Drive is completed.
3. In preparation for the new flyover’s opening, informational and directional traffic signs will be put up to inform motorists. Motorists are advised to plan their routes in advance and to follow traffic signs on site to help them get to their destinations.
4. Please refer to Annex A and B for an overview of the new Seletar Link Flyover.
Annex A: Map of Seletar Link Flyover
Annex B: Aerial view of Seletar Link Flyover