Changi Southern Corridor

Changi Southern Corridor Location Map
Changi Southern Corridor Location Map

Slated for completion in 2034, the Changi Southern Corridor will support the future Changi Airport Terminal 5 (T5) and developments at Changi East. Works will include the reconfiguration of the existing Changi Flyover and Tanah Merah Flyover, and road enhancements to Pan Island Expressway (PIE), East Coast Parkway (ECP), Tanah Merah Coast Road (TMCR) and Xilin Avenue.

These road improvements will:

  • Enhance the multi-modal connectivity of the Changi region;
  • Support the growth and development of Changi’s aviation sector; and
  • Improve access to and from Changi Airport to ECP and PIE/TPE, and between TMCR and PIE through ECP/PIE and will complement the Changi Northern Corridor in providing motorists with an alternative travel route to the region.
     

Cyclists will also enjoy 3.5km of new cycling paths along Xilin Avenue and Tanah Merah Coast Road, in tandem with the enhancements to the road network. These cycling paths will complement the existing Park Connector Network and on-road cycling lanes to connect Tampines and East Coast to T5. Pedestrians, cyclists and other active mobility users can enjoy safer and more comfortable journeys. 

Proposed Enhancement of Pan Island Expressway (PIE) and East Coast Parkway (ECP) between Upper Changi Flyover and Tanah Merah Flyover (Contract DE151)

1.      This project comprises the enhancement of the existing interchange at PIE/ECP/Airport Boulevard with a new vehicular underpass and flyover, widening of the stretch of PIE between Upper Changi Flyover and Changi Flyover and the construction of a new road parallel to ECP between Changi Flyover and Tanah Merah Flyover. 

2.      To facilitate these works, traffic diversion on PIE and ECP will be necessary due to site constraints. LTA will take measures to mitigate inconvenience to motorists and minimise impact to greenery during construction works. 

3.      When completed, motorists can expect smoother traffic flow to and from Changi Airport to ECP and PIE/TPE, and between Tanah Merah Coast Road and PIE. 

Artist’s Impression of Enhancement of PIE and ECP between Upper Changi Flyover and Tanah Merah Flyover
Artist’s Impression of Enhancement of PIE and ECP between Upper Changi Flyover and Tanah Merah Flyover

 

Project commenced:         Sep 2024

Expected completion:       2030

Contractor:                              Samwoh Corporation Pte Ltd

Scroll To Top

Welcome to

LTA.GOV.SG


This quick tour will bring you through the key enhancements.

Use the links at the top navigation bar to help you find what you are looking for


Tutorial Menu Tutorial Menu Tutorial Menu

Jump straight into the popular pages that

are most relevant to you


Tutorial Popular Resources Tutorial Popular Resources Tutorial Popular Resources

Taking a bus, train, or cycling to your

destination? Plan your routes and check

the fares using these tools!


Tutorial Transport Tools Tutorial Transport Tools Tutorial Transport Tools

Our latest featured projects are just a click away!


Tutorial Featured Projects Tutorial Featured Projects Tutorial Featured Projects

Start exploring

LTA.GOV.SG now!



Explore Now!