LTA Awards Two Civil Contracts for Cross Island Line Phase 1

News Releases 08 Nov 2021 civil contracts Cross Island Line (CRL)

          The Land Transport Authority (LTA) has awarded two civil contracts for the design and construction works of the Cross Island Line Phase 1 (CRL1) at a combined contract value of $766 million.        

Design and Construction of Aviation Park station and tunnels

2        The first contract was awarded to Hock Lian Seng Infrastructure Pte. Ltd. for the design and construction of Aviation Park station and tunnels at a contract value of $320 million.

3        Hock Lian Seng Infrastructure Pte. Ltd has a strong track record of undertaking infrastructure and building projects in Singapore. The company was previously involved in the construction of Kim Chuan Depot for Circle Line (CCL) and Marina Bay station along CCL. It is currently involved in the construction of Maxwell station along the Thomson-East Coast Line (TEL).

4        Construction works for the Aviation Park station are expected to start in the first quarter of 2022, with passenger service slated to commence in 2030.

Engineering Highlights

5        Aviation Park station is an underground station located next to Changi Coast Road and Aviation Park Road. The ground conditions in this area are expected to be challenging as they are made up of thick layers of underlying marine clay. Safety measures will be taken when carrying out the Earth Retaining and Stabilising Structure and deep excavation works to ensure stability of the ground and surrounding structures. The works will be carried out under strict compliance to regulations including aviation height restrictions given its proximity to the Changi Airport compound. LTA and the contractor will monitor the works closely to ensure that they are carried out safely.

Design and Construction of Bored Tunnel between Tampines North and Defu stations

6        The civil contract for the design and construction of the bored tunnel between Tampines North and Defu stations was awarded to Nishimatsu Construction Co., Ltd at contract value of $446 million. The contract includes the construction of a facility building with underground basements to cater to the electrical and mechanical requirements of CRL1.

7        Nishimatsu Construction Co., Ltd is an established company with a strong track record of undertaking infrastructure, building and tunnelling projects locally and abroad. It constructed the tunnels between Ubi and Kaki Bukit stations along the DTL, as well as the reception tunnels for DTL to Tai Seng Facility Building. It is currently involved in the construction of Gardens by the Bay station on TEL and Keppel station on the CCL.

Engineering Highlights

8        A large-diameter Tunnel Boring Machine (TBM), measuring about 12.6 metres in diameter, will be used to construct a single 2.9-kilometre long tunnel with two tracks in it. This will be the largest tunnel boring machine ever to be deployed in Singapore and it is expected to increase work productivity and reduce manpower requirements. The tunnel will be constructed at an approximate depth of 35 metres below ground level, and is almost 50 metres underground at its deepest.  

9        Tunnelling will be carried out mostly in Old Alluvium, which is a predominantly soil-like material comprising sandy and silty clay. This abrasive ground condition is expected to cause some wear to the TBM’s cutting equipment. LTA and the contractor will closely monitor the TBM’s progress and ensure that all works are carried out safely and timely with minimal impact to existing structures, including the shophouses in the area. Construction works for the bored tunnel between Tampines North station and Defu station are expected to start in December 2021.

About the CRL

10       The CRL is Singapore’s eighth MRT line. It will serve existing and future developments in the eastern, north-eastern and western corridors, linking major hubs such as Jurong Lake District, Punggol Digital District and Changi region. The CRL will have almost half of its stations as interchanges with other rail lines, making it easier and more convenient for commuters to travel across the rail network.

11       CRL1 is 29 kilometres long and comprises 12 stations from Aviation Park to Bright Hill[1]. This will serve residential and industrial areas in Loyang, Tampines, Pasir Ris, Defu, Hougang, Serangoon North and Ang Mo Kio and benefit more than 100,000 households. With CRL1, common recreational spaces such as Changi Beach Park and Bishan-Ang Mo Kio Park will be more accessible by public transport. Studies on the details of subsequent CRL phases are ongoing.

 

Enclosed: 
Annex A – Location Maps
Annex B – Artist Impressions of CRL1 Aviation Park station
Annex C – Travel Time Savings with CRL1 Aviation Park station


[1] All station names are working names.

Scroll To Top

Welcome to

LTA.GOV.SG


This quick tour will bring you through the key enhancements.

Use the links at the top navigation bar to help you find what you are looking for


Tutorial Menu Tutorial Menu Tutorial Menu

Jump straight into the popular pages that

are most relevant to you


Tutorial Popular Resources Tutorial Popular Resources Tutorial Popular Resources

Taking a bus, train, or cycling to your

destination? Plan your routes and check

the fares using these tools!


Tutorial Transport Tools Tutorial Transport Tools Tutorial Transport Tools

Our latest featured projects are just a click away!


Tutorial Featured Projects Tutorial Featured Projects Tutorial Featured Projects

Start exploring

LTA.GOV.SG now!



Explore Now!