Tuas West Extension

Tuas West Extension Opens 18 June

what is the Tuas West Extension?

Tuas West Extension Map

The Tuas West Extension (TWE) opened for passenger service on 18 June 2017, extending the East-West Line from the existing Joo Koon station with four new stations – Gul Circle, Tuas Crescent, Tuas West Road and Tuas Link.

The TWE is expected to benefit 100,000 commuters daily and improve MRT connectivity in the Tuas area.

Press Release: Tuas West Extension Opens on 18 June 2017

 

How will commuters benefit from the extension?

Getting to and around the Tuas area will be much quicker, thanks to the direct rail connection provided by the TWE. Commuters working in the Jurong and Tuas industrial estates can enjoy significant time savings. For example, a journey from Ang Mo Kio to Tuas West can be cut by about 35 minutes, i.e. down from about 100 minutes currently to 65 minutes!

Tuas West Time Savings

 

TUAS VIADUCT (PART OF THE TUAS WEST EXTENSION PROJECT)

A 4.8km long road viaduct opened on 18 February 2017, enhancing transport connectivity to businesses in Tuas with more travel options.

Read more on the Tuas Viaduct here.