VIADUCT FROM TPE TO PIE(WESTBOUND) AND UPPER CHANGI ROAD EAST

Viaduct TPE to PIE 

Start Date: 1st Qtr 2016

End Date: 1st Qtr 2020

The main scope of works include the construction of a one way 2-lane viaduct from TPE(Changi) to PIE(Westbound) and Upper Changi Road East including the re-alignment of this stretch of TPE and PIE.

When completed, the viaduct will provide a direct route for motorists travelling from TPE(Changi) to PIE(Westbound) and Upper Changi Road East, bypassing the current heavy traffic conditions experienced along this stretch of TPE(Changi) between Loyang Flyover and Upper Changi Flyover and the existing signalised junctions at  Loyang Ave/Tampines Ave 7 and Upper Changi Road North/Upper Changi Road East.